Case Study

CFS 

Industry

Aeroplane Parts Manufacturing

Size

30,000 sq ft

Duration

12 weeks

The Challenge

CFS came to Rhino with a completely empty new unit, looking for us to design and install mezzanines and fit-out two floors of office space. We needed to make sure we could achieve the required loading for each of the three mezzanine floors, (one of which needed to store in excess of 50 engines!) and that the column supports worked with the workshops, offices and labs below.

It was paramount that the fitout met all the different departments' processes and priorities. This meant consulting with engineers and various staff members to ensure this happened.

The factory design had to ensure the building, fire ratings, fire detection, emergency lighting, heating and ventilation all adhered to current regulations. Alongside this, certain areas required temperature control and specific electrical requirements due to the high quantity of machinery onsite.

Our Solution

We presented CFS with a full, detailed, schedule of works along with all the costings and programme just 18 days after our first visit. 

The key to CFS's project was a detailed and specific schedule of works that was followed closely to ensure everything was completed within the given time frame, From office design and fit-out to construction of load-bearing mezzanines and warehouse facilities, everything was completed to high standard within the 16 week time frame.

 

We Provided

Office Fit Out
Project Management
Workshop & Laboratory Fitout
Decoration
Electrics and Lighting
Warehouse Mezzanine
Partitioning
Full Width Footer Image cfs

Rhino approached the planning of this very major project in a calm and objective way, helping us to clarify our thinking and suggesting many options to help us better utilise the space, with many design features adding enormous value to the end result. Once the design was agreed and the work schedule planned, the team ensured the project stayed on track. Even though there were many changes, they were none the less extremely accommodating in incorporating these into the plan.

Throughout the project Rhino worked in harmony with us and were always prepared to go that extra mile to ensure the quality of the work was of the highest order.

Rhino have a great team who were as committed to the project as we were. As such we would have no hesitation in recommending them to any company who wants a major design and refurbishment project done to a very high quality and on a tight timescale.

David Newhouse, CEO